Skip to content

Phase 2 Tier 1 Documentation Review Checklist

Created: 2025-11-19 Purpose: Track documentation updates required for Phase 2 time synchronization implementation Status: In Progress


Overview

Phase 2 introduces hybrid time synchronization for bilateral motor coordination between peer devices. This requires updates to multiple specification and architecture documents to ensure consistency across the codebase.

Key Changes: - Hybrid sync approach (initial connection + periodic 10-60s corrections) - ±100ms timing accuracy requirement - Synchronized fallback operation during BLE disconnects - JPL-compliant time sync module implementation


Tier 1 - Critical Documents

CLAUDE.md

  • Update project phase status to "Phase 2 - Time Synchronization" (Currently: v0.2.0-beta.1, Phase 1c Complete)
  • Add Phase 2 section documenting time sync implementation
  • Update "Future Work Considerations" to reflect completed time sync work
  • Add build commands for Phase 2 time sync test environment
  • Document new time_sync.h/c module and API

Priority: HIGH - Primary reference document for Claude Code


README.md

  • Update project phase to Phase 2
  • Add time synchronization to feature list
  • Update version number if bumping to v0.3.0
  • Verify quick start instructions include Phase 2 builds

Priority: HIGH - Public-facing documentation


docs/requirements_spec.md

  • Verify FR002 (Bilateral Alternation) timing requirements match ±100ms
  • Update FR004 (Battery Life) with sync protocol power budget
  • Add FR0XX for time synchronization accuracy requirement
  • Update NFR001 (Reliability) with sync fallback behavior
  • Document BLE message overhead for sync beacons

Priority: CRITICAL - Defines project requirements


docs/architecture_decisions.md

AD028 - Command-and-Control Architecture

  • Update from pure command-based to hybrid sync approach
  • Document periodic sync beacon protocol (10-60s intervals)
  • Add exponential backoff strategy for sync intervals
  • Update fallback behavior section for disconnect scenarios
  • Status: Needs major revision

AD029 - Timing Requirements and Accuracy

  • Confirm ±100ms accuracy specification
  • Document achieved accuracy with hybrid sync (measured vs specified)
  • Add crystal drift analysis (±10 PPM ESP32-C6)
  • Status: Verify current spec, add measurements

AD036 - Time Synchronization Architecture (NEW)

  • Create comprehensive AD documenting hybrid sync design
  • Document three-phase protocol (connection, periodic, command)
  • Include state machine diagrams for sync protocol
  • Add battery impact analysis
  • Document sync quality metrics
  • Status: NEW - requires creation

AD010 - Race Condition Prevention

  • Update with time sync race conditions (if any)
  • Document sync message ordering guarantees
  • Add timestamp wraparound handling (32-bit overflow)
  • Status: Review and update if needed

Priority: CRITICAL - Core architecture documentation


Tier 2 - Implementation Guides

QUICK_START.md

  • Add Phase 2 build instructions
  • Document time sync testing procedure
  • Update "What's Next" section to reflect Phase 2 completion
  • Add troubleshooting for sync issues

Priority: MEDIUM - User onboarding


BUILD_COMMANDS.md

  • Add build command for Phase 2 test environment
  • Document time sync validation commands
  • Add monitoring commands for sync quality metrics

Priority: MEDIUM - Developer reference


test/README.md

  • Document time_sync_test.c purpose and usage
  • Add test procedures for timing validation
  • Include oscilloscope measurement instructions
  • Document expected sync accuracy results

Priority: MEDIUM - Test documentation


Tier 3 - Supporting Documentation

Session Summaries

  • Create SESSION_SUMMARY_PHASE_2.md upon completion
  • Document design decisions made during implementation
  • Include testing results and validation data
  • Add lessons learned and gotchas

Priority: LOW - Historical record


CHANGELOG.md

  • Add [Unreleased] section for Phase 2 changes
  • Document new features (time sync module)
  • List API additions and changes
  • Note any breaking changes to existing code

Priority: MEDIUM - Version tracking


Review Criteria

Before marking Phase 2 complete, verify:

Consistency Checks

  • All timing specifications use ±100ms accuracy
  • Battery impact documented consistently across all docs
  • Sync interval range (10-60s) mentioned uniformly
  • Fallback behavior described identically in all locations

JPL Compliance Documentation

  • All new code follows JPL Power of Ten rules
  • Static allocation verified and documented
  • Loop bounds documented with max iteration counts
  • Watchdog subscription verified for time sync task
  • Error handling documented for all sync operations

Testing Documentation

  • Test procedures clearly documented
  • Expected results specified with tolerances
  • Failure modes and troubleshooting included
  • Hardware requirements listed (oscilloscope, etc.)

API Documentation

  • All public functions in time_sync.h documented
  • Parameter ranges and units specified
  • Return value meanings documented
  • Usage examples provided

Implementation Notes

  1. docs/architecture_decisions.md (AD036 - new, AD028 - update, AD029 - verify)
  2. Establishes technical foundation for other docs
  3. Must be complete before updating specs

  4. docs/requirements_spec.md

  5. Updates requirements based on architecture
  6. Needed before updating user-facing docs

  7. CLAUDE.md

  8. Primary reference for Claude Code
  9. Integrates architecture and requirements

  10. README.md and QUICK_START.md

  11. User-facing documentation
  12. Reflects completed implementation

  13. BUILD_COMMANDS.md and test/README.md

  14. Developer reference
  15. Documents testing and validation

  16. CHANGELOG.md and session summaries

  17. Historical record
  18. Created when implementation complete

Completion Tracking

Documents Updated: 0 / 15 Status: Not Started Target Completion: TBD (when Phase 2 implementation complete)


Notes

  • Keep this checklist updated as implementation progresses
  • Mark items complete only after review for consistency
  • Document any deviations from original plan in session summary
  • Cross-reference related ADs when making updates