Phase 6s Testing - Critical Bug Report¶
Test Date: 2025-12-03 07:50 AM Version Tested: v0.6.56 (Phase 6s - Two-Stage Antiphase Lock) Test Duration: ~8 minutes Test Mode: Mode 4 (Custom) - 0.5Hz, 79% duty, PWM 58%
Deployment Status: Phase 6s (v0.6.56) deployed to therapist for live testing Hardware Status: Development paused for new unit assembly
Summary¶
Phase 6s testing revealed three critical bugs that must be fixed before production deployment:
- Bug #48: Role Assignment Ignores Battery Level (CRITICAL - affects fairness)
- Bug #49: Convergence Issues - Lock Timeout and Loss (HIGH - affects reliability)
- Bug #50: Mode 4 Duty Cycle UX Confusion (MEDIUM - affects user understanding)
Bug #48: Role Assignment Ignores Battery Level (CRITICAL)¶
Symptom¶
SERVER role is determined by power-on order, not battery level, despite battery-based role assignment being implemented in Phase 1c.
Evidence from Serial Logs¶
Dev A (powered on first) - serial_log_dev_a_0750-20251203.txt:
Line 16: W (4982) BLE_MANAGER: No peer battery data - falling back to discovery-based role
Line 24: I (5252) BLE_MANAGER: SERVER role assigned (BLE MASTER)
Dev B (powered on second) - serial_log_dev_b_0750-20251203.txt:
Line 16: W (4612) BLE_MANAGER: No peer battery data - falling back to discovery-based role
Line 24: I (4882) BLE_MANAGER: CLIENT role assigned (BLE SLAVE)
Root Cause¶
Battery data is not being exchanged during discovery phase, causing both devices to fall back to discovery-based role assignment (BLE MASTER/SLAVE), which is determined by which device initiates the connection (powered on first).
Impact¶
- Fairness issue: Device with higher battery should be SERVER to balance load
- User confusion: Role assignment appears random (actually based on power-on order)
- Therapeutic impact: Higher-battery device may run out first if used as CLIENT
Expected Behavior¶
Per AD035 (Battery-Based Initial Role Assignment): - Both devices broadcast battery level via BLE Service Data (Battery Service UUID 0x180F) - Peer extracts battery from scan response BEFORE connection - Higher battery device initiates connection (becomes SERVER/MASTER) - Lower battery device waits (becomes CLIENT/SLAVE)
Files to Investigate¶
src/ble_manager.c- Battery data broadcasting in advertising packetssrc/ble_manager.c- Battery extraction from scan responsesrc/ble_manager.c:2256-2319- Battery-based role assignment logic
Proposed Fix¶
- Verify battery level is being broadcast in advertising Service Data
- Verify peer battery extraction from scan response
- Add logging to show battery comparison during role assignment
- Ensure fallback only occurs if battery data genuinely unavailable
Bug #49: Convergence Issues - Lock Timeout and Loss (HIGH)¶
Symptom¶
CLIENT device experiences: - 5-second antiphase lock timeout during startup - Lock loss during session requiring re-establishment via beacons
Evidence from Serial Logs¶
Dev B (CLIENT) - serial_log_dev_b_0750-20251203.txt:
Line 78: W (11437) MOTOR_TASK: CLIENT: Antiphase lock TIMEOUT after 5s
Line 116: W (22437) MOTOR_TASK: CLIENT: Antiphase lock LOST (will re-establish via beacons)
Offset Drift Analysis:
Initial offset: -3958835 µs
Stable offset: -3970000 µs (approximately)
Drift range: ~12 ms over session
Root Cause¶
Phase 6s two-stage antiphase lock is too conservative: - Waits for steady-state filter mode (10+ samples) before lock detection - Beacons arrive at 1-2 second intervals → 10-20 second wait time - 5-second timeout triggers before lock can be established
Impact¶
- UX degradation: CLIENT appears "frozen" while waiting for lock
- Therapeutic disruption: Lock loss during session interrupts bilateral stimulation
- User confusion: Asymmetric startup behavior (SERVER starts immediately, CLIENT waits)
Expected Behavior¶
Per Phase 6t implementation: - Fast lock beacon burst (5 beacons @ 200ms = 1 second) - Early variance-based lock detection (±2ms threshold over 5 samples) - Lock achieved in ~1 second (vs 5+ seconds in Phase 6s)
Phase 6t Fixes (Already Implemented in PR #4)¶
src/time_sync_task.c:674-686- Forced beacon burst after handshakesrc/time_sync.c:827-835- 200ms beacon intervals (vs 500ms)src/time_sync.c:1505-1548- Early variance-based lock detectionsrc/motor_task.c:564-573- Coordinated 1.5s start delay
Status¶
RESOLVED in Phase 6t (v0.6.57) - Awaiting hardware testing
Bug #50: Mode 4 Duty Cycle UX Confusion (MEDIUM)¶
Symptom¶
Mode 4 (Custom) displays "79% duty" but actual motor duty cycle is 39.5%, causing user confusion about haptic intensity.
Evidence from Serial Logs¶
Dev A (SERVER) - serial_log_dev_a_0750-20251203.txt:
Line 690: I (167272) MOTOR_TASK: Mode 4 (Custom): 0.50Hz, 79% duty → ACTIVE[790ms motor + 210ms coast] | INACTIVE[1000ms], PWM=58%
Duty Cycle Calculation:
User Setting: 79% duty
Cycle Period: 2000ms (0.5Hz)
ACTIVE Period: 1000ms (50% of cycle)
Motor ON Time: 790ms (79% of ACTIVE period)
Actual Duty Cycle: 790ms / 2000ms = 39.5% (NOT 79%!)
Root Cause¶
Semantic ambiguity in "duty cycle" definition: - User expectation: Duty cycle = % of total cycle with motor ON - Firmware implementation: Duty cycle = % of ACTIVE period with motor ON (correct for bilateral) - Display: Shows "79% duty" without clarifying it's relative to ACTIVE period
Why Current Behavior is Correct¶
For bilateral alternation, ACTIVE and INACTIVE periods MUST be equal (50/50 split): - ACTIVE period = cycle / 2 (e.g., 1000ms @ 0.5Hz) - INACTIVE period = cycle / 2 (e.g., 1000ms @ 0.5Hz)
If "79% duty" meant "79% of total cycle": - ACTIVE period = 1580ms - INACTIVE period = 420ms - This BREAKS bilateral alternation (not 50/50)
Therefore, duty cycle MUST be relative to ACTIVE period to maintain bilateral symmetry.
Impact¶
- User confusion: Expects 79% haptic feedback, gets 39.5%
- UX issue: Display is misleading ("79% duty" sounds like total cycle duty)
- Therapeutic concern: User may set excessively high duty trying to reach desired intensity
Proposed Fixes (Choose One)¶
Option 1: Change Display to Show Actual Duty Cycle (Recommended)
// Before:
ESP_LOGI(TAG, "Mode 4 (Custom): %.2fHz, %u%% duty → ...", freq_x100 / 100.0f, duty, ...);
// After:
uint8_t actual_duty = (motor_on_ms * 100) / cycle_ms; // 790/2000 = 39.5%
ESP_LOGI(TAG, "Mode 4 (Custom): %.2fHz, %u%% total duty (%u%% active) → ...",
freq_x100 / 100.0f, actual_duty, duty, ...);
Option 2: Relabel to "Active Period Duty"
Option 3: Add BLE Characteristic Description Update mobile app UI to clarify: - Label: "Motor Duty (% of active period)" - Help text: "Percentage of the active half-cycle with motor ON. 100% = continuous during active period."
Files to Modify¶
src/motor_task.c:354-357- Logging displaysrc/ble_manager.c- BLE characteristic descriptions (if Option 3)
Additional Issue: Time Sync Initialization Race Condition¶
Symptom¶
time_sync_on_reconnection() called before time_sync module initialization completes.
Evidence from Serial Logs¶
Dev A (SERVER) - serial_log_dev_a_0750-20251203.txt:
Line 44: E (5732) TIME_SYNC: Not initialized
Line 51: W (5732) BLE_MANAGER: time_sync_on_reconnection failed; rc=259
Root Cause¶
CCCD write callback triggers time_sync_on_reconnection() before time_sync_init() completes.
Impact¶
- Initialization failure: Time sync may not start properly after reconnection
- Error logging: Confusing error messages during normal startup
- Potential instability: Undefined behavior if time sync functions called before init
Proposed Fix¶
Add initialization check in time_sync_on_reconnection():
esp_err_t time_sync_on_reconnection(void) {
if (!g_time_sync_state.initialized) {
ESP_LOGW(TAG, "Time sync not yet initialized, deferring reconnection setup");
return ESP_ERR_INVALID_STATE;
}
// ... existing code
}
Test Configuration¶
Hardware: - Device A (SERVER): COM3, powered on first - Device B (CLIENT): COM7, powered on second
Firmware: - Version: v0.6.56 (Phase 6s) - Build: xiao_esp32c6_ble_no_nvs
Mode Settings: - Mode: 4 (Custom) - Frequency: 0.50Hz (50 × 100) - Duty Cycle: 79% (of active period) - PWM Intensity: 58%
Test Environment: - Date: 2025-12-03 - Session duration: ~8 minutes - No user intervention during test
Recommendations¶
Immediate Fixes (Phase 6u or Hotfix)¶
- Bug #48 (Battery Role Assignment) - CRITICAL
- Priority: P0 - Must fix before production deployment
- Effort: Medium (1-2 hours debugging + testing)
-
Risk: High if not fixed (fairness and battery life)
-
Bug #49 (Convergence) - HIGH
- Priority: P1 - Already fixed in Phase 6t
- Effort: Zero (just deploy Phase 6t)
-
Risk: Medium (UX degradation, not a safety issue)
-
Bug #50 (Duty Cycle UX) - MEDIUM
- Priority: P2 - Can be fixed incrementally
- Effort: Low (15-30 minutes for display change)
-
Risk: Low (UX confusion, not a functional issue)
-
Time Sync Race Condition - LOW
- Priority: P3 - Minor initialization issue
- Effort: Low (15 minutes for guard check)
- Risk: Very low (self-corrects after init)
Testing Plan¶
- Fix Bug #48 first - Battery-based role assignment
- Merge Phase 6t - Fast lock (already fixes Bug #49)
- Fix Bug #50 - Duty cycle display clarity
- Hardware test all fixes - 90-minute stress test with two devices
- Deploy to therapist - Only after all critical bugs fixed
Phase 6t Deployment Decision¶
Phase 6t (v0.6.57) in PR #4 already addresses Bug #49 (convergence issues). Recommend: - Merge Phase 6t to main after fixing Bug #48 - Test Phase 6t on hardware before therapist deployment - Update CHANGELOG with all bug fixes
Appendix: Serial Log Analysis¶
Battery Voltage Tracking¶
Dev A (SERVER):
Dev B (CLIENT):
Short test duration (~8 min) shows no significant battery drain.
Time Sync Offset Tracking (Dev B CLIENT)¶
Initial offset: -3958835 µs
Converged offset: -3970000 µs (approx)
Offset range: ±12 ms variation
Beacon count: 10+ beacons observed
Lock quality: Unstable (timeout + loss events)
Phase 6s lock detection too slow, Phase 6t should resolve this.